folding container house
folding container house
folding container house
folding container house
folding container house
folding container house

Z-type folding container house | Airtight folding, built-in drainage to prevent water accumulation

Innovative Short-Side Folding Technology for Efficient and Secure Folding
The Z folding container house features a unique short-side folding structure design, resulting in a high volume compression ratio during transportation, significantly reducing logistics costs. The folding process is secure and reliable, effectively preventing dust and rainwater from entering during transit, ensuring the interior remains clean before arrival at the site, laying the foundation for rapid deployment.

Built-in Drainage System to Eliminate Water Accumulation Problems
This product features an integrated drainage system with scientifically designed drainage slopes and internal pipes, ensuring rapid removal of rainwater and accumulated water in any usage environment. This completely solves the leakage and water accumulation problems of traditional folding houses. Whether in rainy weather or on uneven ground, the Z folding container house maintains a dry and comfortable interior.

High Reliability and Rapid Deployment, Adaptable to Multiple Scenarios
Thanks to its high-quality sealing structure and smooth drainage design, the Z folding container house combines folding convenience with reliable performance. It's ready to use right out of the box and unfolds quickly, making it suitable for various scenarios such as construction site camps, emergency shelters, and mobile offices, providing users with a high-quality mobile space solution that is efficient, reliable, and practical.
Quantity
Contact Now
Download
Product Description
Parameter table
Parameter table
Product Description

Guangdong Zhonghuilvjian Moving House Technology Co., Ltd. 
Web: www.cgchcontainer.com
Factories Add: East Rd, Anhi Province & Dongshan Xinyue Rd, Guangdong ; Office Add:No. 662, Huangpu Avenue Middle, Tianhe District, Guangzhou, China     _
Material listReference picture
Product
specification
Dimension(exterior)5900(L)mm*2500(W)mm*2470(H)mm
Dimension(interior)5780(L)mm*2340(W)mm*2280(H)mm
Dimension(folding)5900(W)mm*2500(W)mm*450(H)mm
Type of roofFlat roof inner drain pipe
Stacked layers≤3 layers
Design ParametersService life20 years
Earthquake resistanceClass A
Wind resistanceClass 10
Fire preventionClass A
Ground live load2.0KN/㎡
Roof live load1.0KN/㎡
StructureColumn180×150×2210mm,Roller beam,Q235B material,(2.5mm thickness)
Roof main beam50mm*130mm,Roller beam,Q235B material,(2.5mm thickness)
Roof secondary beam50mm*25mm, galvanized cold rolled section steel,Q235B material,(1.2mm thickness)
Bottom main beam50mm*130mm,Roller beam,Q235B material,(2.5mm thickness)
Bottom secondary beam80mm*40mm, galvanized cold rolled section steel,Q235B material,(1.2mm thickness)
Bolts8 pieces high-strength bolts(8.8 levels)
PaintElectrostatic spraying plastic powder painting≥80μm
Roof Waterproof layer0.4mm thick galvanized color steel plate, white gray color, PE coating; 180 degree seam overlap
 
Insulation layerGlass wool insulation layer, 50mm thick, single-sided aluminum foil, bulk density 10kg/m³, combustion performance is Class A1 non-combustible.
Ceiling0.42mm thickness, color pearl white, PE coating
Floor boardSubstrate18mm fireproof cement fiber board with 1.6mm pvc flooring
 
WallInsulation50mm thick EPS  sandwich panel, Class A fire protection, 12kg/m³

 
Color steel platewhite 0.275mm thickness
DoorSizeW840mm*H2035mm, Horizontal sliding, with window cover


 
MaterialSteel door, concealed buckle lock
WindowSize800mm*1100mm
 
MaterialSliding Plastic steel window
Glasssingle layer glass
ElectricityLightingLED strip light × 2 sets, 36W/set, 1200

 
Socket10A five-hole socket × 3, 16A air-conditioning socket × 1, reserved weak current cassette × 1
switchOne-button switch × 1
distribution boxConcealed electrical box 32A × 1
Industrial plugincluded
WiringHousehold line: 6 squares, air-conditioning socket: 4 squares , five-hole socket: 2.5 squares, lighting: 1.5 squares, all plus white sheath tube
OthersFolding hardwareSpecial parts, no hinges
Parameter table
Parameter table

FAQ

In which scenarios are CGCH's products primarily applied?

CGCH modular building products are widely utilized across a diverse range of settings, including commercial retail, dining spaces, cultural tourism and hospitality, engineering camps, emergency support facilities, military research centers, and arts and cultural venues. Whether the project calls for a pop-up shop, a café, or a resort hotel—or even a polar research station or disaster relief housing—we are able to provide customized solutions.

How long does it take to install one standard unit?

The service life varies slightly across different product series:

Detachable and Foldable Container houses: 10–15 years

Expandable Containers: 15–20 years

Space Pods: The main structural components carry a 30-year warranty, and the overall design life exceeds 30 years.

Under conditions of normal use and maintenance, the products are capable of stable, long-term operation.

How is the thermal insulation performance of container homes?

We utilize 50–100mm rock wool, polyurethane (PU), or glass wool sandwich panels, combined with a thermal-break structure, to accommodate environments ranging from extreme cold at -48°C to scorching desert heat at +46°C. The doors and windows come standard with triple-glazed, double-cavity insulated glass, effectively blocking thermal conduction.

What are the typical application scenarios?

We utilize 50–100mm rock wool, polyurethane (PU), or glass wool sandwich panels, combined with a thermal-break structure, to accommodate environments ranging from extreme cold at -48°C to scorching desert heat at +46°C. The doors and windows come standard with triple-glazed, double-cavity insulated glass, effectively blocking thermal conduction.

How long does it take to install a container house?

Installation times vary depending on the product type:

Foldable Container house(Type X): 10 minutes (2 people)

Foldable Container house(Type Z): 15 minutes (3 people + crane)

Detachable Container House: 3 hours (4 people)

Expandable Container House: 10 minutes to expand (4 people)

Space Capsule: Ready for occupancy within 2 hours of arrival

Detailed installation diagrams and video tutorials are provided for all products.

Does CGCH provide overseas installation services?

Yes. For projects valued at over one million, we can dispatch professional technical personnel to the site to supervise the installation. For standard projects, we provide multilingual installation videos, technical drawings, and remote video support to ensure that local workers can complete the installation independently.

Project Cases

Qatar World Cup Fan Village Project

CGCH successfully supplied detachable container houses for the Qatar World Cup Fan Village, providing fast, flexible, and comfortable accommodation solutions for international visitors. Thanks to their modular design, rapid installation, and durable steel structure, the units were deployed efficiently to meet the large-scale accommodation demands of the tournament. This project demonstrated the reliability and versatility of CGCH container housing solutions for major global events.

Russia Yelabuga International Camp Project

CGCH successfully delivered a large-scale Flat Pack Container House project for the Yelabuga International Camp in Russia, providing modern accommodation and support facilities for workers and project personnel. Designed to withstand harsh climate conditions, the modular buildings feature excellent thermal insulation, robust steel structures, and rapid installation capabilities. Through efficient production, transportation, and on-site assembly, CGCH helped the client create a comfortable, durable, and scalable living environment, demonstrating the reliability of our container housing solutions in large international projects.

Philippines Modular Housing Project

Following the powerful earthquakes that struck Turkey in 2023, hundreds of thousands of people were left homeless and in urgent need of emergency housing that could be rapidly deployed, easily transported, and adapted to cold weather conditions. Roads in the disaster zones were severely damaged, making it difficult for heavy machinery to gain access. CGCH supplied 2,000 units of its "Z-type" foldable container housing, featuring extra-thick 75mm wall panels and underfloor heating systems to meet the winter thermal insulation requirements of the affected regions. When folded, ten units can be loaded into a single 40-foot High Cube container, significantly reducing shipping costs. Upon arrival at the site, a team of three workers—assisted by just one small crane—can fully unfold and set up a single unit in as little as 15 minutes, requiring no complex foundation work.