Post-Disaster Reconstruction Detachable Container House

Rapid Deployment
Flat-pack transportation and quick on-site assembly help provide emergency housing in a short time.
Safe and Comfortable
A galvanized steel frame and insulated sandwich panels offer structural stability, thermal insulation, and reliable shelter.
Flexible Configuration
The interior can include beds, lighting, heating, bathrooms, and other basic facilities for different reconstruction needs.
Quantity
Contact Now
Product Description
Parameter table
Video
Product Description
Parameter table
Item Specification
Product Name Post-Disaster Reconstruction Detachable Container House
Product Type Prefabricated modular emergency housing
Standard External Size 5950 × 3000 × 2800 mm
Building Area Approx. 17–17.85 m²
Main Structure Galvanized steel frame
Frame Connection High-strength bolted connection
Optional Frame Thickness 1.5 / 2.0 / 2.25 / 2.3 / 2.7 / 3.0 mm
Wall Panel 50 mm EPS sandwich panel as standard
Optional Wall Materials Rock wool or PU sandwich panels
Roof System Steel roof structure with insulation and interior ceiling
Floor System Structural floor board with optional PVC or SPC flooring
Standard Door Steel security door
Standard Window PVC or aluminum sliding window
Electrical System Lighting, switches, sockets and distribution box
Optional Facilities Beds, heating, air conditioning, bathroom and furniture
Standard Layout Open room or customized family accommodation layout
Installation Quick on-site assembly by bolted components
Recommended Installation Team Approx. 4 workers per standard unit
Loading Capacity Approx. 17 standard units per 40HQ container
Combination Method Stand-alone, horizontally connected or multi-unit arrangement
Application Emergency shelter, temporary housing, medical room, site office and relief camp
Insulation Performance Adjustable according to local climate and panel material
Exterior Color Customizable
Interior Layout Customizable
Water and Drainage System Optional according to project requirements
Service Life Depends on configuration, environment and maintenance
Video

FAQ

In which scenarios are CGCH's products primarily applied?

CGCH modular building products are widely utilized across a diverse range of settings, including commercial retail, dining spaces, cultural tourism and hospitality, engineering camps, emergency support facilities, military research centers, and arts and cultural venues. Whether the project calls for a pop-up shop, a café, or a resort hotel—or even a polar research station or disaster relief housing—we are able to provide customized solutions.

How long does it take to install one standard unit?

The service life varies slightly across different product series:

Detachable and Foldable Container houses: 10–15 years

Expandable Containers: 15–20 years

Space Pods: The main structural components carry a 30-year warranty, and the overall design life exceeds 30 years.

Under conditions of normal use and maintenance, the products are capable of stable, long-term operation.

How is the thermal insulation performance of container homes?

We utilize 50–100mm rock wool, polyurethane (PU), or glass wool sandwich panels, combined with a thermal-break structure, to accommodate environments ranging from extreme cold at -48°C to scorching desert heat at +46°C. The doors and windows come standard with triple-glazed, double-cavity insulated glass, effectively blocking thermal conduction.

What are the typical application scenarios?

We utilize 50–100mm rock wool, polyurethane (PU), or glass wool sandwich panels, combined with a thermal-break structure, to accommodate environments ranging from extreme cold at -48°C to scorching desert heat at +46°C. The doors and windows come standard with triple-glazed, double-cavity insulated glass, effectively blocking thermal conduction.

How long does it take to install a container house?

Installation times vary depending on the product type:

Foldable Container house(Type X): 10 minutes (2 people)

Foldable Container house(Type Z): 15 minutes (3 people + crane)

Detachable Container House: 3 hours (4 people)

Expandable Container House: 10 minutes to expand (4 people)

Space Capsule: Ready for occupancy within 2 hours of arrival

Detailed installation diagrams and video tutorials are provided for all products.

Does CGCH provide overseas installation services?

Yes. For projects valued at over one million, we can dispatch professional technical personnel to the site to supervise the installation. For standard projects, we provide multilingual installation videos, technical drawings, and remote video support to ensure that local workers can complete the installation independently.

Project Cases

Qatar World Cup Fan Village Project

CGCH successfully supplied detachable container houses for the Qatar World Cup Fan Village, providing fast, flexible, and comfortable accommodation solutions for international visitors. Thanks to their modular design, rapid installation, and durable steel structure, the units were deployed efficiently to meet the large-scale accommodation demands of the tournament. This project demonstrated the reliability and versatility of CGCH container housing solutions for major global events.

Russia Yelabuga International Camp Project

CGCH successfully delivered a large-scale Flat Pack Container House project for the Yelabuga International Camp in Russia, providing modern accommodation and support facilities for workers and project personnel. Designed to withstand harsh climate conditions, the modular buildings feature excellent thermal insulation, robust steel structures, and rapid installation capabilities. Through efficient production, transportation, and on-site assembly, CGCH helped the client create a comfortable, durable, and scalable living environment, demonstrating the reliability of our container housing solutions in large international projects.

Philippines Modular Housing Project

Following the powerful earthquakes that struck Turkey in 2023, hundreds of thousands of people were left homeless and in urgent need of emergency housing that could be rapidly deployed, easily transported, and adapted to cold weather conditions. Roads in the disaster zones were severely damaged, making it difficult for heavy machinery to gain access. CGCH supplied 2,000 units of its "Z-type" foldable container housing, featuring extra-thick 75mm wall panels and underfloor heating systems to meet the winter thermal insulation requirements of the affected regions. When folded, ten units can be loaded into a single 40-foot High Cube container, significantly reducing shipping costs. Upon arrival at the site, a team of three workers—assisted by just one small crane—can fully unfold and set up a single unit in as little as 15 minutes, requiring no complex foundation work.